Ongoing
Lithium Hydroxide Project
3LiLithium
Client Name:
Confidential
Hyperlink:
Project Name:
Lithium Hydroxide Project
Background:
The client is an emerging lithium producer and has started looking into transforming spodumene concentrate from one of its mining projects into battery-grade lithium hydroxide.
Scope of Services:
Synectiq is assisting the client to complete internal economic and technical assessments in preparation for more advanced technical studies. Synectiq is responsible for:
- Setting the criteria related to the process and flowsheet design for the processing of spodumene concentrate and its conversion into lithium hydroxide.
- 3D modelling of future facilities and the general layout.
- Defining the project structure.
- Project controls (timeline and costs).
- Estimating capital and operating expenditures.
- Financial modelling.
- Producing an internal technical report.
Synectiq was also mandated by the client to begin the subsequent technical studies and will manage and integrate these studies.
Facilisi morbi tempus iaculis urna id volutpat lacus. Aliquam etiam erat velit scelerisque in dictum non consectetur a. Morbi tristique senectus et netus et malesuada fames ac turpis.
Lorem ipsumCEO Explore other projects
In a joint venture with SOQUEM in September 2021, Sayona acquired a 60% majority of the Moblan project which is
In early 2023, the North American Lithium project restarted operations of its spodumene lithium mine and concentrator project located in
A project aiming to reopen a copper mine that was in operation from 1955 to 1999. The next step of the project is to undertake a conceptual evaluation of the project followed by a preliminary economic assessment.
A preliminary economic assessment was carried out in 2022 at the Pine Point project to produce zinc and lead concentrates. The next step of the project is to undertake a feasibility study.
Following the publication of the project feasibility study, detailed engineering has begun to support the plan of producing on average 306,000 ounces over 10 years.
Major gold mine project currently in construction. The Greenstone Gold Mine is projected to produce 5 million ounces of gold over a 14 years mine life.
Australian company carrying out lithium exploration in northern Québec. Winsome is currently in the exploratory phase of their project and are planning to undertake a preliminary economic assessment of the Adina project.