Ongoing
Moblan, Quebec, Canada
3LiLithium
Client Name:
Sayona Nord Inc.
Project Name:
Moblan, Quebec, Canada
Background:
In a joint venture with SOQUEM in September 2021, Sayona acquired a 60% majority of the Moblan project which is located in a world-class lithium-rich mining region in the Eeyou Istchee James Bay region. The company intends to develop the Moblan project to increase its footprint in the green economy supply chain.
Scope of Services:
As part of its scope of services, Synectiq is managing metallurgical testwork, developing processes and providing project management services for the feasibility study.
Facilisi morbi tempus iaculis urna id volutpat lacus. Aliquam etiam erat velit scelerisque in dictum non consectetur a. Morbi tristique senectus et netus et malesuada fames ac turpis.
Lorem ipsumCEO Explore other projects
On November 22, 2022, Li-FT acquired a 100% interest in the Yellowknife Lithium project, consisting of mineral leases covering most
In early 2023, the North American Lithium project restarted operations of its spodumene lithium mine and concentrator project located in
A project aiming to reopen a copper mine that was in operation from 1955 to 1999. The next step of the project is to undertake a conceptual evaluation of the project followed by a preliminary economic assessment.
A preliminary economic assessment was carried out in 2022 at the Pine Point project to produce zinc and lead concentrates. The next step of the project is to undertake a feasibility study.
Following the publication of the project feasibility study, detailed engineering has begun to support the plan of producing on average 306,000 ounces over 10 years.
Major gold mine project currently in construction. The Greenstone Gold Mine is projected to produce 5 million ounces of gold over a 14 years mine life.
An emerging lithium producer that is exploring the prospect of transforming its spodumene concentrate into lithium hydroxide.
Australian company carrying out lithium exploration in northern Québec. Winsome is currently in the exploratory phase of their project and are planning to undertake a preliminary economic assessment of the Adina project.