Detailed engineering has begun on the project with a targeted production rate of 3,400 tonnes per day. The mine is expected to produce 306,000 ounces of gold every year at an average grade of 8.1 g/t. The current mine life of the project is estimated at 10 years, for a total production of 2.94 million ounces of gold.
Scope of Services:
As part of its mandate, Synectiq was integrated within Osisko Mining’s project team to act as a technical advisor and project manager. More specifically, our team helped the client:
- Manage, in collaboration with engineering firms, the general layout of the process plant and water treatment plant
- Develop the electrical infrastructure and process control strategy with the client and engineering firms
- Define and develop project controls (timeline and costs)
Facilisi morbi tempus iaculis urna id volutpat lacus. Aliquam etiam erat velit scelerisque in dictum non consectetur a. Morbi tristique senectus et netus et malesuada fames ac turpis.
Lorem ipsumCEO Explore other projects
On November 22, 2022, Li-FT acquired a 100% interest in the Yellowknife Lithium project, consisting of mineral leases covering most
In a joint venture with SOQUEM in September 2021, Sayona acquired a 60% majority of the Moblan project which is
In early 2023, the North American Lithium project restarted operations of its spodumene lithium mine and concentrator project located in
A project aiming to reopen a copper mine that was in operation from 1955 to 1999. The next step of the project is to undertake a conceptual evaluation of the project followed by a preliminary economic assessment.
A preliminary economic assessment was carried out in 2022 at the Pine Point project to produce zinc and lead concentrates. The next step of the project is to undertake a feasibility study.
Major gold mine project currently in construction. The Greenstone Gold Mine is projected to produce 5 million ounces of gold over a 14 years mine life.
An emerging lithium producer that is exploring the prospect of transforming its spodumene concentrate into lithium hydroxide.
Australian company carrying out lithium exploration in northern Québec. Winsome is currently in the exploratory phase of their project and are planning to undertake a preliminary economic assessment of the Adina project.